About Us

The plant premises fully utilize green, clean energy, featuring a 1,600 kW photovoltaic power station that generates 2.2 million kWh of electricity annually, complemented by a ground-source heat pump system for heating and cooling. A wastewater treatment plant and exhaust-gas treatment facilities are in place to handle industrial wastewater and emissions, while the storage and transportation areas for hazardous chemicals are managed with robust controls.

1600 W

Photovoltaic power station

220 Ten thousand degrees

Annual power generation capacity

1600W photovoltaic power station

1600W photovoltaic power station

Wastewater Station

Wastewater Station

Improved management of hazardous chemical storage and transportation facilities.

Improved management of hazardous chemical storage and transportation facilities.

The facility covers an area of 70,000 square meters and has an annual production capacity of 500,000 tons, including over 50,000 tons of synthetic ester oils. Its finished-product storage and bottling capacity totals 150,000 tons.

7 ten thousand square meters

Land area

50 Ten thousand tons

Annual production capacity

5 Ten thousand tons

Synthetic ester oil

15 Ten thousand tons

Finished-product tank storage and filling capacity

Small-package finished goods warehouse

Small-package finished goods warehouse

A corner of the tank farm

A corner of the tank farm

Aerial view of the tank storage facility

Aerial view of the tank storage facility

Implement a 5S enterprise management system for smart green energy production, featuring fully automated process design and intelligent control of manufacturing.

5 S

Enterprise Management System

Smart Workshop

Smart Workshop

Fully automated filling line

Fully automated filling line

DCS Control Room

DCS Control Room

Twelve domestically produced single‑vessel stainless steel high‑pressure sealed reactors, with a maximum individual capacity, capable of operating within a controllable temperature range of –30°C to 300°C, and equipped with process units for atmospheric and vacuum distillation, caustic washing, solvent recovery, and other operations.

12 set

High-pressure sealed reactor

-

30 °C

—

300 °C

Production Temperature Control

Real-life footage of the synthetic ester production line

Real-life footage of the synthetic ester production line

High-pressure sealed reactor

High-pressure sealed reactor

Complex production integrated process unit

Complex production integrated process unit

Ganghe Petroleum places a strong emphasis on technological innovation and R&D. Its R&D center is equipped with more than 70 sets of testing instruments, enabling a step-by-step, stage-by-stage validation process that spans product development, small-scale pilot production, scale-up trials, and full-scale commercial manufacturing.

70 Remaining units

Testing equipment

Just with the Petroleum Research and Development Lab

Just with the Petroleum Research and Development Lab

Just with the petroleum laboratory.

Just with the petroleum laboratory.

Pilot-scale production of the product

Pilot-scale production of the product